Sunday, July 02, 2006

Windows and More

We went to visit our housing site today to check on the progress.

There were a few things that have changed.

1) All of the Windows and Doors are In. We verified that all of them are the Low-E windows and that the cranks we paid for are all there.
2) The basement stairs are in. We got to go to the basement today, that is the first time since they poured the foundation walls that we have been down there.
3) The stairs leading upstairs are in, they are covered for now though.
4) All of the plumbing is pretty much installed.
5) Most of the ducts are also installed.

They are really zooming along, on Thursday there was no windows, doors, bricks or stairs. I can say it was a shock to both of us that they had progressed so much.

Bricked Front:


Basement Rough Ins:


Future Home Theather:


Basement Stairs:


Fireplace: