Hello:

The builder has started to put up the drywall on our house.

Here is what has changed since the last post.

1) The blue speaker cavity barriers are now installed.
2) The drywall is almost completely installed.
3) The front Pillars are installed
4) The siding on the front is finished.
5) The messy brickwork on the front of the garage has been fixed up, it now looks amazingly good.
6) The garage floor is now poured.
7) The garage is FULLY drywalled.

Here are some recent pictures:

Speaker Cavity Installed:



Drywalled Laundry Room:


Future Spot for an LCD Wall TV in our Master Bedroom:


Speaker Wire in the Drywalled Ceiling:


Guest Bedroom Wall Drywalled:


Drywalled Garage:


Family Room looking out the front:


Kitchen:


Front Door Looking in:


Switches:


Switches, Switches and Even More Switches:



Current Front of the House: