It has been a little while since our last post. Here is what has changed since the last post.

1) The Drywall Taping is now complete.
2) The drywall has been sanded and primed.
3) The textured ceiling is finished on the second floor.
4) Our speaker locations in the master bedroom have been cutout and they are in a good place.
5) The garage doors and front door have been painted.
6) Our satellite wires have been dropped through the soffitt.
7) The house has been thoroughly cleaned up.
8) The scratch coat for the tile floors has been completed this morning.


Here are some of the latest pictures:

Painted front Door:


Speaker Cutout in Master Bedroom:


Kitchen Scratch Coat:


Roof of Front Porch:


Satellite Wire:


Front of House: