Monday, August 21, 2006

Tiles and Stair Rails

A few things have happened since our last post. Here is a run down of the latest progress.

1) The outside Windows have been caulked.
2) The furnance has been delivered and installation has begun.
3) The tiles are installed (except for ensuite).
4) The trim has been delivered
5) The stair rails have been installed

Unfortunately our ensuite is not tiled yet since the wall tiles are possibly discontinued. Mattamy is searching for more of our wall tiles, but we have picked new tile in case they cannot find it. The tiles we have picked as replacement is just simple white subway tile (3"X6").

Here are some pictures:

Front of the House:


Rear of the house:



Energuide Label on our Furnance:


Kitchen tile (this is laid at 45 degree angle):


Main Washroom Floor tile:


Main Washroom Wall Tile:


Main Washroom Ceiling Tile:


Laundry Room Floor Tile:


Trim and Doors are Delivered:


Stair Railings:




Duct Work in the Basement:

0 Comments:

Post a Comment

<< Home