It has been a fairly long time since we updated our blog. We have not updated our blog since our house has been mainly locked up recently.
We had our PDI this morning so we have lots of progress to report.
The house is now basically finished.
Here is what has changed since the last post.
1) The Grass is all in (Ya, no mud in our yard this spring!)
2) Hardwood is installed.
3) Carpet runner is installed.
4) Structured wiring is finished
5) Door to pantry is finished.
6) All painting is completed
7) and the list goes on
The PDI went amazing. I cannot believe the customer service from Mattamy. At one point I think there was 2 or 3 handymen following us around fixing any problems we noted. There really were no major problems, the things we listed were mostly as follows:
1) A tile that wasn't flat in the ensuite
2) A tile that wasn't nicely laid in the main bath.
3) Various paint touch ups.
4) Stain on the first stair.
5) A few minor blemishes on the cupboards.
Here are some pictures taken at the PDI:
Front of House (with Grass):
Looking into the Family Room:
Fireplace:
Stairs:
>
Stuctured Wiring:
Finished Cabling Port:
Magic Pantry Door (When you open, let there be light):
Family Room looking out to the street:
Main Bath:
Upstairs Hardwood:
Ensuite:
Ensuite Shower:
Niches:
Laundry Room: